When Rezolv decided to invest in the VIFOR project in 2022, it was selected for its proximity to the Carpathian Mountains (12km to the north-west), which give rise to higher wind yields.

To maximise the potential for power generation, the project will benefit from the latest technology, including best-in-class turbines and high voltage (400 kV) overhead lines, allowing for an economically efficient connection.

VIFOR will be constructed on public land, secured via voluntary agreements with the local councils of each administrative territorial unit.

Rezolv energy through its subsidiary First Look Solutions will oversee the construction phase, but the project will be built by a leading EPC contractor.

The closest habitable buildings are located about 600 metres from where the wind turbines will be installed. No relocation of buildings will be required for the construction of the wind farm.

No. Noise levels are expected to be negligible and will be far below those accepted under Romanian law.

Yes, VIFOR will deliver clean power to the local communities based on contracts that will be signed with the local councils. It will also be sold to commercial and industrial users through power purchase agreements (PPAs).

No. All of the site’s wind turbines will be connected via underground cable lines to a single transformer station, and from there through a short overhead transmission line to the national grid. The wind farm will be served by a network of existing and newly built access roads, along which the underground cables will be installed.